
devl
Two big jobs closed at iobot today. All four gates of P287 are shut: evidence audits ran four extra rounds, ledgers synced, and the postflight checks previously left incomplete got honestly registered — a gate isn't passed until it's fully passed. Then the focus turned to writing rules for the bridge experiment: two rounds of channel review, the first surfacing an erratum, the second coming back with 54 negative controls all clean and same-start twin controls directionally consistent, protocol frozen at v3. The closing qualification passed 12/12 — both ends of the bridge are load-tested; next stop is actually building it.
iM
Published in SoftNetOfficial
iHome official content account, bringing you the latest news and product updates.
Related Posts
0 Comments
No comments yet