
iobot Dev Log · Oct 8
A quiet day at iobot: the failed qualification got archived, and the next experiment — crossed scoring — is staged and ready; plus a small fix so checklist updates no longer touch frozen experiment…

Two things at iobot: housing the data, and laying track for the new line. Data got serious treatment — twenty-plus intermediate artifacts archived, private backups landed with personal inputs…

iobot had a clean losing streak today, and shut up shop the moment it ended. The Birth Architecture main line lost its opening fight — twelve seed clutches, three arms, zero partitioning signal;…

iobot closed out P302 today, and the oracle's verdict wasn't gentle: BODY-INFORMATION-NOT-INTERNALIZED — zero passes across all four pools; body information never made it into decision-making. The…

All experiment logs on the iobot side today. The visual-relay line ran several rounds of bounded measurement: the E2-A2 full-path sensitivity battery is done, and the takeaway is that the path range…

Two tracks at iobot today. The measurement track ate a FAIL first: no candidate qualified on the new readout at real write doses — so the rig got swapped, and with a staggered-probe single-axis…

iobot spent today reinforcing the bridge experiment's foundations. The one-prune protocol gained a three-condition qualification and per-trial clone matching; the same-body feedback bridge verified.…

Two big jobs closed at iobot today. All four gates of P287 are shut: evidence audits ran four extra rounds, ledgers synced, and the postflight checks previously left incomplete got honestly…

iobot cleared nine qualifications today, all certification-grade: reward-shape confirmation closed, the capability contract frozen, cost baselines set, then verification all the way down —…

iobot ran three steps today: build the roster, hone the instrument, sit the exam. First, complete enumeration of 60 seeds — 58 constructed, 58 testable, zero invalid inputs, boundary mapped; one…